![]() |
![]() |
![]() |
||||||
| Tony spotted that the designer of the shell had possibly overlooked where the anchor windlass could be located, as the majority of windlass have the gypsy on the right. |
Looking from bedroom through saloon and galley to wheelhouse. |
Not related to the fit out, this will be her mooring when she is completed. Click image for large picture of the whole of Shardlow Marina. | ||||||
![]() |
![]() |
![]() |
||||||
| Saloon looking into galley. | Rear cabin. | Wardrobe begins to take shape, to be fitted with double doors. |
||||||
![]() |
![]() |
![]() |
||||||
| Bedroom cupboard started, awaiting doors. |
Double bed being built. Bed will be 5ft at the head tapering to 4ft 6in at the foot. | Saloon from wheelhouse steps. | ||||||
![]() An electric anchor winch that will fit in the space available has now been located by Tony. |
![]() |
![]() Mounting for hydraulic tank welded in, brown angle, top centre. |
||||||
| Bed will have 6x20" interlinked drawers, three each side. |
||||||||
Fit out photo's page 1-2-3-4-5-6-7-8-9-10 |
||||||||