![]() |
![]() |
![]() |
||||||
| Hydraulic pipe work for bow thruster being fitted in place. |
Top board of bed cut and fitted. | Bedroom cupboard top and shelf edging fitted in place. |
||||||
![]() |
![]() |
![]() |
||||||
| Bow thruster pipes coming up through galley floor en route to the engine room. | One of the four water storage tanks. | Windows start to go in. | ||||||
![]() |
![]() Waterproof panel work being fitted in the bathroom. |
![]() |
||||||
| Bow thruster hydraulics. | Starting to look more like it. | |||||||
![]() |
![]() |
|||||||
| Porthole in rear cabin being fitted. | Half of rear cabin from cabin steps. | |||||||
| Fit out photo's page 1-2-3-4-5-6-7-8-9-10 |
||||||||